CAEP Consortium Fiscal Reporting 42 Northern Alameda Consortium for Adult Education
Year: 2019-20
CAEP Consortium Fiscal Reporting 42 Northern Alameda Consortium for Adult Education
2019-20 Fiscal Year
Fiscal Report Submittal Status
Quarter 1 | Quarter 2 | Quarter 3 | Quarter 4 | |
---|---|---|---|---|
Alameda Co. Office of Education | Submitted | Not Submitted | Not Submitted | Not Submitted |
Alameda Unified | Submitted | Not Submitted | Not Submitted | Not Submitted |
Berkeley City College | Submitted | Not Submitted | Not Submitted | Not Submitted |
Berkeley Unified | Submitted | Not Submitted | Not Submitted | Not Submitted |
College of Alameda | Submitted | Not Submitted | Not Submitted | Not Submitted |
Laney College | Submitted | Not Submitted | Not Submitted | Not Submitted |
Merritt College | Submitted | Not Submitted | Not Submitted | Not Submitted |
Oakland Unified | Submitted | Not Submitted | Not Submitted | Not Submitted |
Peralta CCD | Submitted | Not Submitted | Not Submitted | Not Submitted |
Piedmont City Unified | Submitted | Not Submitted | Not Submitted | Not Submitted |
Alameda Co. Office of Education
Alameda Co. Office of Education Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $20,764 | $42,691 | 48.64% | $170,764 | 12.16% | $150,000 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
3000 - Employee Benefits | $4,640 | $1,160 | 400% | $4,640 | 100% | $0 |
4000 - Supplies and Materials | $0 | $2,500 | 0% | $10,000 | 0% | $10,000 |
5000 - Other Operating Expenses and Services | $0 | $10,000 | 0% | $40,000 | 0% | $40,000 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,016 | $254 | 400% | $1,016 | 100% | $0 |
Totals | $26,420 | $56,605 | 46.67% | $226,420 | 11.67% | $200,000 |
Corrective Action Plan
Alameda County Office of Education was given $26,420 of the NAAEC's 2018-2019 COLA to be spent prior to December 31, 2019. All of the $26,420 was ear marked and spent for Quarter 1. Other funding has been ear marked for a curriculum design/adoption for Opportunity Academy. We are on schedule to spend down all of the funding allotted to the school by the end of the funding cycle. We did not meet our first quarter goals because we had not solidified our plan of action but have a solid plan in place currently which includes monthly professional development meetings.Summary of Activities:
* Have completed 4 (8 hours each) full day curriculum adoption meetings with all teachers since October 2019 *Consulted with curriculum expert in content area *Have completed 2 benchmarks/reports needed for final adoption- Status
- Submitted
Alameda Co. Office of Education Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $20,764 | $85,382 | 24.32% | $170,764 | 12.16% | $150,000 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
3000 - Employee Benefits | $4,640 | $2,320 | 200% | $4,640 | 100% | $0 |
4000 - Supplies and Materials | $0 | $5,000 | 0% | $10,000 | 0% | $10,000 |
5000 - Other Operating Expenses and Services | $0 | $20,000 | 0% | $40,000 | 0% | $40,000 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,016 | $508 | 200% | $1,016 | 100% | $0 |
Totals | $26,420 | $113,210 | 23.34% | $226,420 | 11.67% | $200,000 |
- Status
- Unsubmitted
Alameda Co. Office of Education Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $20,764 | $128,073 | 16.21% | $170,764 | 12.16% | $150,000 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
3000 - Employee Benefits | $4,640 | $3,480 | 133.33% | $4,640 | 100% | $0 |
4000 - Supplies and Materials | $0 | $7,500 | 0% | $10,000 | 0% | $10,000 |
5000 - Other Operating Expenses and Services | $0 | $30,000 | 0% | $40,000 | 0% | $40,000 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,016 | $762 | 133.33% | $1,016 | 100% | $0 |
Totals | $26,420 | $169,815 | 15.56% | $226,420 | 11.67% | $200,000 |
- Status
- Unsubmitted
Alameda Co. Office of Education Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $20,764 | $170,764 | 12.16% | $170,764 | 12.16% | $150,000 |
2000 - Non-Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
3000 - Employee Benefits | $4,640 | $4,640 | 100% | $4,640 | 100% | $0 |
4000 - Supplies and Materials | $0 | $10,000 | 0% | $10,000 | 0% | $10,000 |
5000 - Other Operating Expenses and Services | $0 | $40,000 | 0% | $40,000 | 0% | $40,000 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $1,016 | $1,016 | 100% | $1,016 | 100% | $0 |
Totals | $26,420 | $226,420 | 11.67% | $226,420 | 11.67% | $200,000 |
- Status
- Unsubmitted
Alameda Unified
Alameda Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $68,020 | $38,786 | 175.37% | $387,863 | 17.54% | $319,843 |
2000 - Non-Instructional Salaries | $43,934 | $51,412 | 85.45% | $205,648 | 21.36% | $161,714 |
3000 - Employee Benefits | $29,140 | $13,529 | 215.39% | $135,287 | 21.54% | $106,147 |
4000 - Supplies and Materials | $10,056 | $0 | 100% | $156,438 | 6.43% | $146,382 |
5000 - Other Operating Expenses and Services | $10,791 | $8,700 | 124.03% | $34,800 | 31.01% | $24,009 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $161,941 | $112,427 | 144.04% | $920,036 | 17.6% | $758,095 |
Summary of Activities:
Providing instruction and instructional support for ESL, HS and CTE. Includes childcare for students enrolled at AAS.- Status
- Submitted
Alameda Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $141,242 | $77,573 | 182.08% | $387,863 | 36.42% | $246,621 |
2000 - Non-Instructional Salaries | $109,641 | $51,412 | 213.26% | $205,648 | 53.31% | $96,007 |
3000 - Employee Benefits | $64,801 | $27,057 | 239.49% | $135,287 | 47.9% | $70,486 |
4000 - Supplies and Materials | $18,305 | $0 | 100% | $156,438 | 11.7% | $138,133 |
5000 - Other Operating Expenses and Services | $17,173 | $8,700 | 197.39% | $34,800 | 49.35% | $17,627 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $351,162 | $164,742 | 213.16% | $920,036 | 38.17% | $568,874 |
Summary of Activities:
ESL, HSD, HSE and CTE programming and related support services, including office administration, counselor, and childcare for adult students.- Status
- Unsubmitted
Alameda Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $141,242 | $116,359 | 121.38% | $387,863 | 36.42% | $246,621 |
2000 - Non-Instructional Salaries | $109,641 | $51,412 | 213.26% | $205,648 | 53.31% | $96,007 |
3000 - Employee Benefits | $64,801 | $40,586 | 159.66% | $135,287 | 47.9% | $70,486 |
4000 - Supplies and Materials | $18,305 | $0 | 100% | $156,438 | 11.7% | $138,133 |
5000 - Other Operating Expenses and Services | $17,173 | $8,700 | 197.39% | $34,800 | 49.35% | $17,627 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $351,162 | $217,057 | 161.78% | $920,036 | 38.17% | $568,874 |
- Status
- Unsubmitted
Alameda Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $141,242 | $155,145 | 91.04% | $387,863 | 36.42% | $246,621 |
2000 - Non-Instructional Salaries | $109,641 | $51,412 | 213.26% | $205,648 | 53.31% | $96,007 |
3000 - Employee Benefits | $64,801 | $54,115 | 119.75% | $135,287 | 47.9% | $70,486 |
4000 - Supplies and Materials | $18,305 | $0 | 100% | $156,438 | 11.7% | $138,133 |
5000 - Other Operating Expenses and Services | $17,173 | $8,700 | 197.39% | $34,800 | 49.35% | $17,627 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $351,162 | $269,372 | 130.36% | $920,036 | 38.17% | $568,874 |
- Status
- Unsubmitted
Berkeley City College
Berkeley City College Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $0 | 100% | $57,366 | 0% | $57,366 |
2000 - Non-Instructional Salaries | $21,727 | $38,631 | 56.24% | $154,524 | 14.06% | $132,797 |
3000 - Employee Benefits | $8,735 | $21,125 | 41.35% | $84,498 | 10.34% | $75,763 |
4000 - Supplies and Materials | $1,868 | $5,250 | 35.58% | $21,000 | 8.9% | $19,132 |
5000 - Other Operating Expenses and Services | $0 | $6,168 | 0% | $24,670 | 0% | $24,670 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $32,330 | $71,173 | 45.42% | $342,058 | 9.45% | $309,728 |
Corrective Action Plan
Benefit expense differ based on projection and less instructional salaries.Summary of Activities:
Started non-credit ESOL classes, Started non-credit bridge to community health worker program, provided transition support to a cohort of 224 students in the fall semester in non-credit and credit classes at the community college level.- Status
- Submitted
Berkeley City College Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $14,342 | 0% | $57,366 | 0% | $57,366 |
2000 - Non-Instructional Salaries | $21,727 | $38,631 | 56.24% | $154,524 | 14.06% | $132,797 |
3000 - Employee Benefits | $8,735 | $21,125 | 41.35% | $84,498 | 10.34% | $75,763 |
4000 - Supplies and Materials | $1,868 | $5,250 | 35.58% | $21,000 | 8.9% | $19,132 |
5000 - Other Operating Expenses and Services | $0 | $6,168 | 0% | $24,670 | 0% | $24,670 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $32,330 | $85,515 | 37.81% | $342,058 | 9.45% | $309,728 |
- Status
- Unsubmitted
Berkeley City College Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $20,078 | 0% | $57,366 | 0% | $57,366 |
2000 - Non-Instructional Salaries | $21,727 | $38,631 | 56.24% | $154,524 | 14.06% | $132,797 |
3000 - Employee Benefits | $8,735 | $21,125 | 41.35% | $84,498 | 10.34% | $75,763 |
4000 - Supplies and Materials | $1,868 | $5,250 | 35.58% | $21,000 | 8.9% | $19,132 |
5000 - Other Operating Expenses and Services | $0 | $6,168 | 0% | $24,670 | 0% | $24,670 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $32,330 | $91,251 | 35.43% | $342,058 | 9.45% | $309,728 |
- Status
- Unsubmitted
Berkeley City College Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $22,946 | 0% | $57,366 | 0% | $57,366 |
2000 - Non-Instructional Salaries | $21,727 | $38,631 | 56.24% | $154,524 | 14.06% | $132,797 |
3000 - Employee Benefits | $8,735 | $21,125 | 41.35% | $84,498 | 10.34% | $75,763 |
4000 - Supplies and Materials | $1,868 | $5,250 | 35.58% | $21,000 | 8.9% | $19,132 |
5000 - Other Operating Expenses and Services | $0 | $6,168 | 0% | $24,670 | 0% | $24,670 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $32,330 | $94,119 | 34.35% | $342,058 | 9.45% | $309,728 |
- Status
- Unsubmitted
Berkeley Unified
Berkeley Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $114,112 | $0 | 100% | $1,727,963 | 6.6% | $1,613,851 |
2000 - Non-Instructional Salaries | $95,062 | $0 | 100% | $618,896 | 15.36% | $523,834 |
3000 - Employee Benefits | $70,562 | $0 | 100% | $628,093 | 11.23% | $557,531 |
4000 - Supplies and Materials | $4,624 | $0 | 100% | $342,072 | 1.35% | $337,448 |
5000 - Other Operating Expenses and Services | $35,161 | $0 | 100% | $292,007 | 12.04% | $256,846 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $15,976 | $0 | 100% | $180,453 | 8.85% | $164,477 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $335,497 | $0 | 100% | $3,789,484 | 8.85% | $3,453,987 |
- Status
- Submitted
Berkeley Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $114,112 | $0 | 100% | $1,727,963 | 6.6% | $1,613,851 |
2000 - Non-Instructional Salaries | $95,062 | $0 | 100% | $618,896 | 15.36% | $523,834 |
3000 - Employee Benefits | $70,562 | $0 | 100% | $628,093 | 11.23% | $557,531 |
4000 - Supplies and Materials | $4,624 | $0 | 100% | $342,072 | 1.35% | $337,448 |
5000 - Other Operating Expenses and Services | $35,161 | $0 | 100% | $292,007 | 12.04% | $256,846 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $15,976 | $0 | 100% | $180,453 | 8.85% | $164,477 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $335,497 | $0 | 100% | $3,789,484 | 8.85% | $3,453,987 |
- Status
- Unsubmitted
Berkeley Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $114,112 | $0 | 100% | $1,727,963 | 6.6% | $1,613,851 |
2000 - Non-Instructional Salaries | $95,062 | $0 | 100% | $618,896 | 15.36% | $523,834 |
3000 - Employee Benefits | $70,562 | $0 | 100% | $628,093 | 11.23% | $557,531 |
4000 - Supplies and Materials | $4,624 | $0 | 100% | $342,072 | 1.35% | $337,448 |
5000 - Other Operating Expenses and Services | $35,161 | $0 | 100% | $292,007 | 12.04% | $256,846 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $15,976 | $0 | 100% | $180,453 | 8.85% | $164,477 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $335,497 | $0 | 100% | $3,789,484 | 8.85% | $3,453,987 |
- Status
- Unsubmitted
Berkeley Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $114,112 | $0 | 100% | $1,727,963 | 6.6% | $1,613,851 |
2000 - Non-Instructional Salaries | $95,062 | $0 | 100% | $618,896 | 15.36% | $523,834 |
3000 - Employee Benefits | $70,562 | $0 | 100% | $628,093 | 11.23% | $557,531 |
4000 - Supplies and Materials | $4,624 | $0 | 100% | $342,072 | 1.35% | $337,448 |
5000 - Other Operating Expenses and Services | $35,161 | $0 | 100% | $292,007 | 12.04% | $256,846 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $15,976 | $0 | 100% | $180,453 | 8.85% | $164,477 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $335,497 | $0 | 100% | $3,789,484 | 8.85% | $3,453,987 |
- Status
- Unsubmitted
College of Alameda
College of Alameda Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $2,883 | $0 | 100% | $16,724 | 17.24% | $13,841 |
2000 - Non-Instructional Salaries | $22,895 | $0 | 100% | $91,767 | 24.95% | $68,872 |
3000 - Employee Benefits | $12,076 | $0 | 100% | $47,343 | 25.51% | $35,267 |
4000 - Supplies and Materials | $0 | $0 | 100% | $4,000 | 0% | $4,000 |
5000 - Other Operating Expenses and Services | $65 | $0 | 100% | $18,877 | 0.34% | $18,812 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $37,919 | $0 | 100% | $178,711 | 21.22% | $140,792 |
- Status
- Submitted
College of Alameda Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $2,883 | $0 | 100% | $16,724 | 17.24% | $13,841 |
2000 - Non-Instructional Salaries | $22,895 | $0 | 100% | $91,767 | 24.95% | $68,872 |
3000 - Employee Benefits | $12,076 | $0 | 100% | $47,343 | 25.51% | $35,267 |
4000 - Supplies and Materials | $0 | $0 | 100% | $4,000 | 0% | $4,000 |
5000 - Other Operating Expenses and Services | $65 | $0 | 100% | $18,877 | 0.34% | $18,812 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $37,919 | $0 | 100% | $178,711 | 21.22% | $140,792 |
- Status
- Unsubmitted
College of Alameda Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $2,883 | $0 | 100% | $16,724 | 17.24% | $13,841 |
2000 - Non-Instructional Salaries | $22,895 | $0 | 100% | $91,767 | 24.95% | $68,872 |
3000 - Employee Benefits | $12,076 | $0 | 100% | $47,343 | 25.51% | $35,267 |
4000 - Supplies and Materials | $0 | $0 | 100% | $4,000 | 0% | $4,000 |
5000 - Other Operating Expenses and Services | $65 | $0 | 100% | $18,877 | 0.34% | $18,812 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $37,919 | $0 | 100% | $178,711 | 21.22% | $140,792 |
- Status
- Unsubmitted
College of Alameda Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $2,883 | $0 | 100% | $16,724 | 17.24% | $13,841 |
2000 - Non-Instructional Salaries | $22,895 | $0 | 100% | $91,767 | 24.95% | $68,872 |
3000 - Employee Benefits | $12,076 | $0 | 100% | $47,343 | 25.51% | $35,267 |
4000 - Supplies and Materials | $0 | $0 | 100% | $4,000 | 0% | $4,000 |
5000 - Other Operating Expenses and Services | $65 | $0 | 100% | $18,877 | 0.34% | $18,812 |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $37,919 | $0 | 100% | $178,711 | 21.22% | $140,792 |
- Status
- Unsubmitted
Laney College
Laney College Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $8,516 | $11,872 | 71.73% | $79,148 | 10.76% | $70,632 |
2000 - Non-Instructional Salaries | $31,004 | $30,845 | 100.52% | $123,379 | 25.13% | $92,375 |
3000 - Employee Benefits | $23,611 | $29,447 | 80.18% | $117,786 | 20.05% | $94,175 |
4000 - Supplies and Materials | $0 | $0 | 100% | $8,000 | 0% | $8,000 |
5000 - Other Operating Expenses and Services | $0 | $0 | 100% | $13,369 | 0% | $13,369 |
6000 - Capital Outlay | $0 | $0 | 100% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $63,131 | $72,163 | 87.48% | $346,682 | 18.21% | $283,551 |
Corrective Action Plan
Benefit expense differ based on projection and less academic salary.Summary of Activities:
Increase support/on-boarding for GED students from OACE. Planning meetings between Laney TL with OACE TL and OACE GED Instructor to support GED students in exploring college after GED and dual enrollment during GED. Laney TL also holds regular planning meetings with staff from Restoring Our Communities, a Laney College program supporting justice impacted students, to develop bi-directional referral and on-boarding for justice impacted students that needs GED or considering college courses.- Status
- Submitted
Laney College Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $8,516 | $23,744 | 35.87% | $79,148 | 10.76% | $70,632 |
2000 - Non-Instructional Salaries | $31,004 | $61,690 | 50.26% | $123,379 | 25.13% | $92,375 |
3000 - Employee Benefits | $23,611 | $58,893 | 40.09% | $117,786 | 20.05% | $94,175 |
4000 - Supplies and Materials | $0 | $2,000 | 0% | $8,000 | 0% | $8,000 |
5000 - Other Operating Expenses and Services | $0 | $3,342 | 0% | $13,369 | 0% | $13,369 |
6000 - Capital Outlay | $0 | $3,500 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $63,131 | $153,169 | 41.22% | $346,682 | 18.21% | $283,551 |
- Status
- Unsubmitted
Laney College Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $8,516 | $55,404 | 15.37% | $79,148 | 10.76% | $70,632 |
2000 - Non-Instructional Salaries | $31,004 | $92,534 | 33.51% | $123,379 | 25.13% | $92,375 |
3000 - Employee Benefits | $23,611 | $88,340 | 26.73% | $117,786 | 20.05% | $94,175 |
4000 - Supplies and Materials | $0 | $4,000 | 0% | $8,000 | 0% | $8,000 |
5000 - Other Operating Expenses and Services | $0 | $6,685 | 0% | $13,369 | 0% | $13,369 |
6000 - Capital Outlay | $0 | $3,500 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $63,131 | $250,462 | 25.21% | $346,682 | 18.21% | $283,551 |
- Status
- Unsubmitted
Laney College Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $8,516 | $79,148 | 10.76% | $79,148 | 10.76% | $70,632 |
2000 - Non-Instructional Salaries | $31,004 | $123,379 | 25.13% | $123,379 | 25.13% | $92,375 |
3000 - Employee Benefits | $23,611 | $117,786 | 20.05% | $117,786 | 20.05% | $94,175 |
4000 - Supplies and Materials | $0 | $8,000 | 0% | $8,000 | 0% | $8,000 |
5000 - Other Operating Expenses and Services | $0 | $13,369 | 0% | $13,369 | 0% | $13,369 |
6000 - Capital Outlay | $0 | $5,000 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $63,131 | $346,682 | 18.21% | $346,682 | 18.21% | $283,551 |
- Status
- Unsubmitted
Merritt College
Merritt College Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $5,550 | 0% | $37,000 | 0% | $37,000 |
2000 - Non-Instructional Salaries | $22,806 | $24,460 | 93.24% | $163,065 | 13.99% | $140,259 |
3000 - Employee Benefits | $10,767 | $11,895 | 90.52% | $79,299 | 13.58% | $68,532 |
4000 - Supplies and Materials | $0 | $1,425 | 0% | $9,500 | 0% | $9,500 |
5000 - Other Operating Expenses and Services | $548 | $1,950 | 28.1% | $13,000 | 4.22% | $12,452 |
6000 - Capital Outlay | $0 | $1,059 | 0% | $7,060 | 0% | $7,060 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $34,121 | $46,339 | 73.63% | $308,924 | 11.05% | $274,803 |
Corrective Action Plan
I will spend down by promoting programming for the next quarterSummary of Activities:
In my 5000 series, it should reflect a negative adjustment of 548.00, which should leave a total balance of $33,574.20- Status
- Submitted
Merritt College Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $11,100 | 0% | $37,000 | 0% | $37,000 |
2000 - Non-Instructional Salaries | $22,806 | $48,920 | 46.62% | $163,065 | 13.99% | $140,259 |
3000 - Employee Benefits | $10,767 | $23,790 | 45.26% | $79,299 | 13.58% | $68,532 |
4000 - Supplies and Materials | $0 | $2,850 | 0% | $9,500 | 0% | $9,500 |
5000 - Other Operating Expenses and Services | $548 | $3,900 | 14.05% | $13,000 | 4.22% | $12,452 |
6000 - Capital Outlay | $0 | $2,118 | 0% | $7,060 | 0% | $7,060 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $34,121 | $92,677 | 36.82% | $308,924 | 11.05% | $274,803 |
- Status
- Unsubmitted
Merritt College Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $16,650 | 0% | $37,000 | 0% | $37,000 |
2000 - Non-Instructional Salaries | $22,806 | $73,379 | 31.08% | $163,065 | 13.99% | $140,259 |
3000 - Employee Benefits | $10,767 | $35,685 | 30.17% | $79,299 | 13.58% | $68,532 |
4000 - Supplies and Materials | $0 | $4,275 | 0% | $9,500 | 0% | $9,500 |
5000 - Other Operating Expenses and Services | $548 | $5,850 | 9.37% | $13,000 | 4.22% | $12,452 |
6000 - Capital Outlay | $0 | $3,177 | 0% | $7,060 | 0% | $7,060 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $34,121 | $139,016 | 24.54% | $308,924 | 11.05% | $274,803 |
- Status
- Unsubmitted
Merritt College Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $22,200 | 0% | $37,000 | 0% | $37,000 |
2000 - Non-Instructional Salaries | $22,806 | $97,839 | 23.31% | $163,065 | 13.99% | $140,259 |
3000 - Employee Benefits | $10,767 | $47,579 | 22.63% | $79,299 | 13.58% | $68,532 |
4000 - Supplies and Materials | $0 | $5,700 | 0% | $9,500 | 0% | $9,500 |
5000 - Other Operating Expenses and Services | $548 | $7,800 | 7.03% | $13,000 | 4.22% | $12,452 |
6000 - Capital Outlay | $0 | $4,236 | 0% | $7,060 | 0% | $7,060 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $34,121 | $185,354 | 18.41% | $308,924 | 11.05% | $274,803 |
- Status
- Unsubmitted
Oakland Unified
Oakland Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $334,572 | $0 | 100% | $1,357,063 | 24.65% | $1,022,491 |
2000 - Non-Instructional Salaries | $78,177 | $0 | 100% | $295,029 | 26.5% | $216,852 |
3000 - Employee Benefits | $140,785 | $0 | 100% | $605,385 | 23.26% | $464,600 |
4000 - Supplies and Materials | $165 | $0 | 100% | $203,714 | 0.08% | $203,549 |
5000 - Other Operating Expenses and Services | $18,696 | $0 | 100% | $180,391 | 10.36% | $161,695 |
6000 - Capital Outlay | $0 | $0 | 100% | $1,194,641 | 0% | $1,194,641 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $121,378 | 0% | $121,378 |
Totals | $572,395 | $0 | 100% | $3,957,601 | 14.46% | $3,385,206 |
Summary of Activities:
Providing instruction and instructional support for ESL College and Career Readiness, ESL Family Literacy, HS Diploma and Equivalency.- Status
- Submitted
Oakland Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $334,572 | $0 | 100% | $1,357,063 | 24.65% | $1,022,491 |
2000 - Non-Instructional Salaries | $78,177 | $0 | 100% | $295,029 | 26.5% | $216,852 |
3000 - Employee Benefits | $140,785 | $0 | 100% | $605,385 | 23.26% | $464,600 |
4000 - Supplies and Materials | $165 | $0 | 100% | $203,714 | 0.08% | $203,549 |
5000 - Other Operating Expenses and Services | $18,696 | $0 | 100% | $180,391 | 10.36% | $161,695 |
6000 - Capital Outlay | $0 | $0 | 100% | $1,194,641 | 0% | $1,194,641 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $121,378 | 0% | $121,378 |
Totals | $572,395 | $0 | 100% | $3,957,601 | 14.46% | $3,385,206 |
- Status
- Unsubmitted
Oakland Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $334,572 | $0 | 100% | $1,357,063 | 24.65% | $1,022,491 |
2000 - Non-Instructional Salaries | $78,177 | $0 | 100% | $295,029 | 26.5% | $216,852 |
3000 - Employee Benefits | $140,785 | $0 | 100% | $605,385 | 23.26% | $464,600 |
4000 - Supplies and Materials | $165 | $0 | 100% | $203,714 | 0.08% | $203,549 |
5000 - Other Operating Expenses and Services | $18,696 | $0 | 100% | $180,391 | 10.36% | $161,695 |
6000 - Capital Outlay | $0 | $0 | 100% | $1,194,641 | 0% | $1,194,641 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $121,378 | 0% | $121,378 |
Totals | $572,395 | $0 | 100% | $3,957,601 | 14.46% | $3,385,206 |
- Status
- Unsubmitted
Oakland Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $334,572 | $0 | 100% | $1,357,063 | 24.65% | $1,022,491 |
2000 - Non-Instructional Salaries | $78,177 | $0 | 100% | $295,029 | 26.5% | $216,852 |
3000 - Employee Benefits | $140,785 | $0 | 100% | $605,385 | 23.26% | $464,600 |
4000 - Supplies and Materials | $165 | $0 | 100% | $203,714 | 0.08% | $203,549 |
5000 - Other Operating Expenses and Services | $18,696 | $0 | 100% | $180,391 | 10.36% | $161,695 |
6000 - Capital Outlay | $0 | $0 | 100% | $1,194,641 | 0% | $1,194,641 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $121,378 | 0% | $121,378 |
Totals | $572,395 | $0 | 100% | $3,957,601 | 14.46% | $3,385,206 |
- Status
- Unsubmitted
Peralta CCD
Peralta CCD Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
2000 - Non-Instructional Salaries | $52,842 | $36,546 | 144.59% | $243,643 | 21.69% | $190,801 |
3000 - Employee Benefits | $29,377 | $19,282 | 152.36% | $128,546 | 22.85% | $99,169 |
4000 - Supplies and Materials | $0 | $1,130 | 0% | $7,533 | 0% | $7,533 |
5000 - Other Operating Expenses and Services | $4,664 | $98,291 | 4.75% | $393,163 | 1.19% | $388,499 |
6000 - Capital Outlay | $0 | $750 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $3,475 | $4,667 | 74.45% | $31,115 | 11.17% | $27,640 |
Totals | $90,358 | $160,666 | 56.24% | $809,000 | 11.17% | $718,642 |
Corrective Action Plan
Fill Manager of Special Projects position in Q2.Summary of Activities:
Radio and digital marketing ads for the entire consortium; hiring of temporary assistant; legal contract; annual planning meeting facilitation; equipment purchases- Status
- Submitted
Peralta CCD Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
2000 - Non-Instructional Salaries | $52,842 | $73,093 | 72.29% | $243,643 | 21.69% | $190,801 |
3000 - Employee Benefits | $29,377 | $38,564 | 76.18% | $128,546 | 22.85% | $99,169 |
4000 - Supplies and Materials | $0 | $2,260 | 0% | $7,533 | 0% | $7,533 |
5000 - Other Operating Expenses and Services | $4,664 | $196,582 | 2.37% | $393,163 | 1.19% | $388,499 |
6000 - Capital Outlay | $0 | $1,500 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $3,475 | $9,335 | 37.23% | $31,115 | 11.17% | $27,640 |
Totals | $90,358 | $321,333 | 28.12% | $809,000 | 11.17% | $718,642 |
- Status
- Unsubmitted
Peralta CCD Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
2000 - Non-Instructional Salaries | $52,842 | $109,639 | 48.2% | $243,643 | 21.69% | $190,801 |
3000 - Employee Benefits | $29,377 | $57,846 | 50.79% | $128,546 | 22.85% | $99,169 |
4000 - Supplies and Materials | $0 | $3,390 | 0% | $7,533 | 0% | $7,533 |
5000 - Other Operating Expenses and Services | $4,664 | $294,872 | 1.58% | $393,163 | 1.19% | $388,499 |
6000 - Capital Outlay | $0 | $2,250 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $3,475 | $14,002 | 24.82% | $31,115 | 11.17% | $27,640 |
Totals | $90,358 | $481,999 | 18.75% | $809,000 | 11.17% | $718,642 |
- Status
- Unsubmitted
Peralta CCD Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $0 | $0 | 100% | $0 | 100% | $0 |
2000 - Non-Instructional Salaries | $52,842 | $146,186 | 36.15% | $243,643 | 21.69% | $190,801 |
3000 - Employee Benefits | $29,377 | $77,128 | 38.09% | $128,546 | 22.85% | $99,169 |
4000 - Supplies and Materials | $0 | $4,520 | 0% | $7,533 | 0% | $7,533 |
5000 - Other Operating Expenses and Services | $4,664 | $393,163 | 1.19% | $393,163 | 1.19% | $388,499 |
6000 - Capital Outlay | $0 | $3,000 | 0% | $5,000 | 0% | $5,000 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $3,475 | $18,669 | 18.61% | $31,115 | 11.17% | $27,640 |
Totals | $90,358 | $642,665 | 14.06% | $809,000 | 11.17% | $718,642 |
- Status
- Unsubmitted
Piedmont City Unified
Piedmont City Unified Q1 Report (7/1 - 9/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,289 | $35,934 | 62.03% | $143,734 | 15.51% | $121,445 |
2000 - Non-Instructional Salaries | $29,129 | $27,740 | 105.01% | $110,961 | 26.25% | $81,832 |
3000 - Employee Benefits | $21,062 | $27,296 | 77.16% | $109,182 | 19.29% | $88,120 |
4000 - Supplies and Materials | $0 | $4,483 | 0% | $17,933 | 0% | $17,933 |
5000 - Other Operating Expenses and Services | $15,927 | $3,179 | 500.97% | $12,717 | 125.24% | |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $88,407 | $98,632 | 89.63% | $394,527 | 22.41% | $306,120 |
Corrective Action Plan
Our budget for other operating expenses and services has been expanded to include contracts for services. Our other expenditures will be adjusted to ensure our total spent does not exceed our allocation.Summary of Activities:
Diploma program and short-term CTE- Status
- Submitted
Piedmont City Unified Q2 Report (10/1 - 12/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,289 | $35,934 | 62.03% | $143,734 | 15.51% | $121,445 |
2000 - Non-Instructional Salaries | $29,129 | $27,740 | 105.01% | $110,961 | 26.25% | $81,832 |
3000 - Employee Benefits | $21,062 | $27,296 | 77.16% | $109,182 | 19.29% | $88,120 |
4000 - Supplies and Materials | $0 | $4,483 | 0% | $17,933 | 0% | $17,933 |
5000 - Other Operating Expenses and Services | $15,927 | $3,179 | 500.97% | $12,717 | 125.24% | |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $88,407 | $98,632 | 89.63% | $394,527 | 22.41% | $306,120 |
- Status
- Unsubmitted
Piedmont City Unified Q3 Report (1/1 - 3/31)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,289 | $35,934 | 62.03% | $143,734 | 15.51% | $121,445 |
2000 - Non-Instructional Salaries | $29,129 | $27,740 | 105.01% | $110,961 | 26.25% | $81,832 |
3000 - Employee Benefits | $21,062 | $27,296 | 77.16% | $109,182 | 19.29% | $88,120 |
4000 - Supplies and Materials | $0 | $4,483 | 0% | $17,933 | 0% | $17,933 |
5000 - Other Operating Expenses and Services | $15,927 | $3,179 | 500.97% | $12,717 | 125.24% | |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $88,407 | $98,632 | 89.63% | $394,527 | 22.41% | $306,120 |
- Status
- Unsubmitted
Piedmont City Unified Q4 Report (4/1 - 6/30)
Object Code | Year to Date (YTD) Expenditure | YTD Forecast | % Expended of YTD Forecast | Project Budget | % Expended of Overall Budget | Budget Remaining |
---|---|---|---|---|---|---|
1000 - Instructional Salaries | $22,289 | $35,934 | 62.03% | $143,734 | 15.51% | $121,445 |
2000 - Non-Instructional Salaries | $29,129 | $27,740 | 105.01% | $110,961 | 26.25% | $81,832 |
3000 - Employee Benefits | $21,062 | $27,296 | 77.16% | $109,182 | 19.29% | $88,120 |
4000 - Supplies and Materials | $0 | $4,483 | 0% | $17,933 | 0% | $17,933 |
5000 - Other Operating Expenses and Services | $15,927 | $3,179 | 500.97% | $12,717 | 125.24% | |
6000 - Capital Outlay | $0 | $0 | 100% | $0 | 100% | $0 |
7000 - Other Outgo | $0 | $0 | 100% | $0 | 100% | $0 |
Indirect Costs | $0 | $0 | 100% | $0 | 100% | $0 |
Totals | $88,407 | $98,632 | 89.63% | $394,527 | 22.41% | $306,120 |
- Status
- Unsubmitted
2020 © California Community Colleges
NOVA Site Version: 4.13.4